FRESNO, Calif. —
The piling rig was in position, ready to drive a concrete pillar 40 feet into the ground. Just beyond the rig on this winter afternoon, trucks and cars continued streaming down State Road 198 in Hanford, separated from the construction site by white dividers.
Then, the pile-driving began. Foot by foot, the rig’s hammer slammed the pillar into the ground with the rhythmic beat of a metronome. With every blow, the ground shook and exhaust spewed. The beam would be one more in a network of pillars pounded deep into the earth to create the foundation for a high-speed rail line that in a matter of years will glide along tracks above the state highway, launching a new era in California’s Central Valley. More